Site icon Eastern Range

FAA Approves SpaceX Starship Activities At KSC

Artist’s rendering of Starship on its launch mount at LC-39A at Kennedy Space Center

The 50,000 foot view

The Federal Aviation Administration released the Final Environmental Impact Statement and its Record of Decision regarding the matter this morning. The Record of Decision approves SpaceX to operate Starship-Super Heavy at Launch Complex 39A at Kennedy Space Center, clearing the final major regulatory hurdle for the company’s next-generation launch vehicle on Florida’s Space Coast.

Now, SpaceX needs to complete the build out its infrastructure at LC-39A, relocate Starship flight hardware from Boca Chica, Texas to KSC, and obtain the necessary FAA launch license(s) to launch the 408.1 feet (124.4 meter) tall rocket. It will be the most powerful rocket to ever launch from the Eastern Range, eclipsing the venerable Saturn V, New Glenn and even SLS Block I.

The decision authorizes up to 44 Starship-Super Heavy launches and 88 landings annually—44 each for the Super Heavy booster and Starship upper stage. Ocean landings on droneships in the Atlantic, Pacific, and Indian Oceans are also permitted.

The approval follows a 16-month environmental review process that began with a Notice of Intent published in May 2024, included multiple public comment periods, and culminated in the Final Environmental Impact Statement released today.

FAA Record of Decision: SpaceX Starship at LC-39A Kennedy Space Center • Signed Jan 29, 2026
Category Details
🚀 Approved Operations
Annual Limits Approved
44 launches88 landings (44 Super Heavy + 44 Starship) • 88 static fires
  • Super Heavy: LC-39A catch or Atlantic Ocean droneship/expendable
  • Starship: LC-39A, Atlantic/Pacific/Indian Ocean droneship or water landing
Infrastructure Approved
~800,000 sq ft improvements: launch mount, catch tower, propellant generation (methane liquefier, air separation unit), storage tanks, deluge ponds, water system (~518,000 L/launch)
⚠️ Significant Environmental Effects
Emissions Significant
NOx: 385.66 tons/yr (54% over threshold, 4.35% of Brevard County)
GHG: 217,354 MT CO2e/yr (319% over threshold, 2.81% of county)
Noise Significant
Sonic booms exceed 60 dB CDNL on 28,595 acres off-KSC • Up to 82% awakening probability at night • Outdoor levels exceed 97 dB max at locations outside KSC/CCSFS
Air Traffic Significant
Avg delay: ~40 min (up to 2 hrs) • Ground stops at Core 30 FL airports • Coordination with Canada, Bahamas, Mexico, Central America, Cuba
🚧 Access Restrictions
Closures Tests: ~396 hrs/yr (4.5%) • Launches/reentries: ~462 hrs/yr (5.3%) • Total: ~10% of year (half day/half night)
NPS revenue impact: $239K–$423K/yr (13–24% loss to Canaveral National Seashore)
🐢 Wildlife Conditions (USFWS)
Training & Surveys Required
All personnel: wildlife training before onsite work (species ID, sea turtle/scrub-jay/indigo snake/manatee protocols) • Pre-construction biological surveys required • Lighting Operations Manual for sea turtle season
Manatee Required
Dedicated observer on vessels in Indian River Lagoon • 50 ft minimum distance • ≤10 knots where observed • No wake/idle near docks
📊 Required Monitoring
Species Monitoring
Scrub-jay: 70% banded in 1 yr, 90% in 3 yrs; census pre/post breeding
Sea turtle: Mar 1–Oct 31; 8 light surveys/yr; all hawksbill/Kemp’s ridley/leatherback nests monitored
Beach mouse: Habitat use, survival, reproduction, population density
Physical Monitoring
Noise: 3 events each for SH/Starship static fires, launches, landings (15 total)
Vibration: Loggers at 0.3 mi, 15″ deep; min 3 launches
🐋 Marine Conditions (NMFS)
Distance & Vessel Required
Activities ≥5 nm from coast (≥1 nm within 50 mi of LC-39A) • No coral reef landings • Dedicated observer on recovery ops • 300 ft from mammals, 150 ft from turtles • ≤10 kts near mother/calf
Right Whale Required
1,500 ft minimum distance • Nov–Apr: SH and Starship cannot both land in critical habitat same flight • No landings in active Slow/Dynamic Mgmt Areas • Flight reports within 30 days until full reusability
🏛️ Historic Preservation (NHPA)
Structures Monitoring
9 structures monitored through first 5 launches + 5 SH landings + 1 Starship landing: St. Gabriel’s Church, Pritchard House, Walker Apts (Titusville); Cocoa Jr High, Aladdin Theater (Cocoa); Cape Canaveral Lighthouse (CCSFS); John Sams House, St. Luke’s Church (Merritt Island); Beach House (KSC)
Programmatic Agreement executed Nov 22, 2025 with FL SHPO & Seminole Tribe
📋 Public Notice & Coordination
Notifications Launch schedules via news outlets, KSC SIMS, NASASpaceflight.com, Florida Today app, Brevard County Emergency Mgmt
Claims Property damage: insurance@spacex.com (SpaceX carries insurance per Commercial Space Launch Act)
Annual Meetings Required
USFWS: Jan 1–31 annually (NASA, SpaceX, FAA, USFWS, NPS, USSF) • NHPA: November annually
Record of Decision: SpaceX Starship-Super Heavy at LC-39A, KSC | Signed: Jan 29, 2026 by Katie L. Cranor, FAA | FAA Project Page

Milestones To Launching Starship From Kennedy Space Center

Updated today:

SpaceX Starship Approval Milestones: LC-39A Kennedy Space Center • FAA Environmental Impact Statement & Launch License Process
Status Milestone Date Details
Complete Notice of Intent PublishedFAA May 10, 2024 FAA initiated the EIS process via Federal Register publication
Complete Public Scoping PeriodFAA May–Jun 2024 Public input gathered on scope of environmental review; ended June 24, 2024
Complete Draft EIS ReleasedFAA Aug 4, 2025 Draft EIS published for up to 44 launches and 44 landings per year
Complete Draft EIS Comment PeriodFAA Aug 4–Sep 29, 2025 Hearings at KSC (Aug 26), Cape Canaveral (Aug 28), virtual (Sept 3); view comments
Complete Final EIS PublicationFAA Jan 30, 2026 Final EIS published addressing all public comments
Complete Record of Decision (ROD)FAA Jan 30, 2026 ROD issued with decision, mitigations, and monitoring requirements
Ongoing Infrastructure CompletionSpaceX Mid-2026 (proj.) Launch mount (installed Nov 2025), tank farm, deluge system, chopstick upgrades
Pending Vehicle Operator LicenseFAA Expected 2026 New or modified launch license for Starship-Super Heavy at LC-39A; FAA project page
Upcoming First Starship LaunchSpaceX 2026 (targeted) Initial vehicles transported from Starbase, Texas via barge
Lead Agency: FAA | Cooperating: NASA, Dept. of Air Force, Coast Guard, Fish & Wildlife, National Park Service | Updated: Jan 30, 2026

FAA Documents

The original documents are at the FAA’s Project Website, located here

Executive Summary

Record of Decision

For those who are interested in reading the minutiae of the Decision, here is a list of links to all available documents:

Exit mobile version